A different waterfront.
Seven proposed buildings. Three sites. See the plan beside what’s here today.
Open in 3D · Participation & review status · Read the sources
Illustrative massing · placement and forms approximate
Three sites. One shoreline.
Empire Outlets
Built atop sections of the existing Empire Outlets complex (EAS p. 11c).
1,200 residential units / 240 to 360 MIH units
former NY Wheel site
Between the terminal building, the garage and the waterfront (EAS p. 11c).
1,000 residential units / 200 to 300 MIH units
Bank Street parcel
Vacant parcel west of the garage, includes part of Bank Street (EAS p. 11a).
300 residential units / 60 to 90 MIH units
MIH means Mandatory Inclusionary Housing. Unit figures are from the supplied assessment dataset.
The proposal at a glance.
- Residential units
- 2,500
- MIH units
- 500–750
- Analysis year
- 2036
- CEQR reference
- 26DME018R
Seven reconstructed building forms follow the supplied September 2026 public presentation, with heights and quantities retained from the North Shore Waterfront Plan assessment. Placement and intermediate dimensions remain approximate; the slides label these designs illustrative.
Read the assessment.
Source: NYCEDC, North Shore Waterfront Plan Environmental Assessment Statement, CEQR 26DME018R, August 26, 2026, Additional Information pages 11c–11d and Table 1.
NYCEDC publishes the assessment, draft scope and scoping materials on its environmental review page. Consult that page for the current review status and participation details.
Participation & review status.
Read the official participation instructions.
Official participation instructions
Reference CEQR 26DME018R. This independent model does not submit formal comments.